Work on our site at Buchanan Street site completed in November 2009. The site had been undeveloped for over 20 years following the demolition of an unsafe tenement block.
The development contains 14 flats (including 2 flats designed for tenants with special needs), made up as follows:
• 6 x 2 bedroom (3 person)
• 8 x 2 bedroom (4 person)